Skip to main content

Meet Mining Companies in London

NexMetals Mining

Promotional Strapline: Redeveloping a District-Scale Critical Metals Camp in Botswana

Primary Ticker:
TSXV:NEXM

Stage of Development: Development, Exploration

Commodity: Cobalt, Copper, Nickel, PGEs

Country/Region: Canada

Market Cap: USD 39.7M

Project Locations: Botswana

Website: NexMetals Mining

NexMetals Mining Corp. is a TSX.V and NASDAQ listed mineral exploration and development company focused on redeveloping the past-producing Selebi and Selkirk copper-nickel-cobalt-platinum group element mines in Botswana. NexMetals has confirmed the scale of mineralization is larger than historical estimates, supported by NI 43-101- and Regulation S-K 1300-compliant resource estimates, with ongoing down-hole geophysics, drilling, and metallurgical programs aimed at expanding resources and supporting future economic studies. The Company is led by an experienced management and technical team with a proven track record in global mineral projects, emphasizing disciplined execution, transparent governance, and long-term stakeholder value creation.


Management Profile:

CEO Sean Whiteford has 30+ years of global experience across exploration, mining operations, project development, and technical studies, including senior roles at BHP, Rio Tinto, and Cliffs, and leadership of business development initiatives at Burgundy Diamond Mines. 


SVP & CFO Brett MacKay is a finance executive with 17+ years in mining, including 11 at Lundin Mining. He brings deep expertise in financial reporting, strategy, and international operations, with a strong track record supporting growth-stage companies. 


What do you think makes your company such a compelling investment?:

NexMetals is redeveloping two past-producing copper-nickel-cobalt mines in Botswana, which have both grown substantially in 2026. At Selebi, the combined resource now stands at 8.95 Mt Indicated (412 Mlbs CuEq) and 41.95 Mt @ 1.45% Cu, 1.01% Ni Inferred (2.3 Blbs CuEq). Selebi Main grew 72% in tonnage and remains open beyond the current estimate. Selebi North nearly tripled its Indicated tonnage, and drilling points to a possible convergence between the two deposits at depth. The Selebi Project benefits from significant existing infrastructure, including shafts, headframes and underground development. 


At Selkirk, contained CuEq rose about 70% to 78.2 Mt @ 0.66% CuEq Indicated, and the strip ratio fell to 1.02:1.  


Clean, separate copper and nickel-cobalt concentrates meeting smelter specifications support both assets.